Requisition Owners and Super Admins can perform this action.
- Navigate to the Hiring Plan dashboard
- Click the three dots menu to the right of an open requisition
- Select Put requisition on hold from the list of options
You can still view, clone, cancel, delete or resume a requisition that is put on hold. To re-open the requisition later, follow the same process, this time selecting Resume requisition.
📊Impact in reports
When calculating the time to fill for a candidate, we do not consider the period when the requisition has been on hold. If, for instance, the time between opening and filling a requisition was 20 days, but the requisition was paused for 5 days, this would result in a time to fill of 15 days (20 days - 5 days).